Projects

View Our Past and Ongoing Projects

PCC installed the site lighting throughout the park as well as the fountain lighting in use today.  A new switchgear was also installed for the fountain.

PCC was instrumental in several of the phases of the recent Route 28 upgrade.  PCC was the general contractor on the first phase of the project when a temporary ITS system was installed for the camera system that runs through the southern corridor of Route 28 near Pittsburgh.  PCC installed the majority of the signs and sign structures in this new section as well as the traffic signals, highway lighting, sign lighting and permanent ITS system.

PCC constructed the site lighting and main power distribution duct bank for the Pittsburgh Mills Mall which encompasses the property.  

PCC installed the electrical systems for several of the toll plazas on this new roadway along with highway lighting systems, sign structures and roadway signage and sign lighting. 

Like what you see?

Do you have questions about our past projects or what we can do for you? Get in touch with us to request a bid or ask a question!

 

Contact Us